CHERENZIA & ASSOCIATES, Ltd.

25 Ledward Ave, P.O. Box 513, Westerly, RI 02891
Call toll free: (877) 596 - 7746
(401) 596-7747;  (401) 596-3610 (fax)
500 Bridge Street, Groton, CT 06340
(860) 405-1900; (860) 405-1990 (fax)
| Home | Services | Staff | Projects | Directions | Email | Return to Cherenzia Companies Home Page
[Line]

Carolyn "CJ" Doyle
Project Engineer/Manager

Responsibilities

Responsible for designs, permitting and project management for a variety of projects including: development plan review for commercial sites, individual sewage disposal systems (ISDS) for both residential and commercial sites, site grading and drainage, and permitting (wetlands, ISDS, planning and zoning, etc.).

  • ISDS design & permitting, development plan review, Weekapaug Golf Club - Westerly, RI
  • ISDS design & permitting, BSI, Inc.- Westerly, RI
  • Numerous residential ISDS designs & permitting-Westerly, Charlestown, Hopkinton, Richmond, RI

CJ Engineering (A Massachusetts Certified WBE) Sandwich, MA; 1996-2001; Owner/President
Responsible for all Title 5 septic system inspections, designs, and related engineering; road and stormwater management facilities design; wastewater treatment related engineering; and all related permitting required by the Planning Board, Board of Health and Conservation Commission.

  • WBE subcontract to Stearns & Wheler, LLC, POTW construction related shop drawing review - Hyannis, MA
  • Septic system design - Sandwich Glass Museum, Sandwich, MA
  • Septic system design - Seafood Sam's, Sandwich, MA
  • Septic system design - Christ Chapel, Barnstable, MA

CONECO Environmental Corp., Bridgewater, MA; 1994-1995; Vice President
Responsible for managing all Title 5 septic system issues and related design engineering, complex hazardous waste site investigations, design/installation/operations and maintenance of soil/soil vapor/groundwater remediation systems, wastewater related issues and technical report review and oversight services.

  • Conducted field investigation and remedial activities including contaminated soil removal and, air sparging/soil vapor extraction system at site of former gasoline service station - Norton, MA
  • Project Manager geotechnical investigations and environmental site assessments - Union Station Revitalization Project - Worcester, MA
  • Conducted oversight of wastewater settling pit closure activities for a private manufacturing client - Brockton, MA

Fay, Spofford & Thorndike, Inc., Burlington, MA; 1981-1994; Principal Engineer
Responsible for planning, design and construction of wastewater collection and treatment facilities. Project responsibilities also included infiltration/inflow studies, sewer system evaluation surveys, definitive subdivision reviews, report writing, bidding/award of contracts, and interfacing with clients, funding/regulatory agencies, contractors, subcontractors, and inspection teams.

  • Facilities Planning, Design & Construction of a $20 million wastewater treatment facility expansion from 2.0 to 4.2 MGD - Dartmouth, MA
  • Land application study, ocean outfall study - Dartmouth, MA
  • Infiltration/Inflow Studies & Sewer System Evaluation Surveys - Dartmouth, MA; Billerica, MA
  • Sewer rehabilitation design & construction - Dartmouth, MA
  • Subdivision and sewer system extension reviews - Dartmouth, MA; Billerica, Ma; Smithfield, RI
Education
Worcester Polytechnic Institute, M.S., 1994 Environmental Engineering
Brown University, B.S., 1981 Civil Engineering

Accreditations
Professional Engineer: Massachusetts and Rhode Island
Class III ISDS Designer - Rhode Island
Certified Soil Evaluator - Massachusetts
Certified Title 5 Inspector - Massachusetts

Professional Affiliations
American Society of Civil Engineers/Boston Society of Civil Engineers
Water Environment Federation