Responsible for designs, permitting and project management for a variety of projects including: development plan review for commercial sites, individual sewage disposal systems (ISDS) for both residential and commercial sites, site grading and drainage, and permitting (wetlands, ISDS, planning and zoning, etc.).
ISDS design & permitting, development plan review, Weekapaug Golf Club - Westerly, RI
ISDS design & permitting, BSI, Inc.- Westerly, RI
Numerous residential ISDS designs & permitting-Westerly, Charlestown, Hopkinton, Richmond, RI
CJ Engineering (A Massachusetts Certified WBE) Sandwich, MA; 1996-2001; Owner/President
Responsible for all Title 5 septic system inspections, designs, and related engineering; road and stormwater management facilities design; wastewater treatment related engineering; and all related permitting required by the Planning Board, Board of Health and Conservation Commission.
WBE subcontract to Stearns & Wheler, LLC, POTW construction related shop drawing review - Hyannis, MA
Septic system design - Sandwich Glass Museum, Sandwich, MA
Septic system design - Seafood Sam's, Sandwich, MA
Septic system design - Christ Chapel, Barnstable, MA
CONECO Environmental Corp., Bridgewater, MA; 1994-1995; Vice President
Responsible for managing all Title 5 septic system issues and related design engineering, complex hazardous waste site investigations, design/installation/operations and maintenance of soil/soil vapor/groundwater remediation systems, wastewater related issues and technical report review and oversight services.
Conducted field investigation and remedial activities including contaminated soil removal and, air sparging/soil vapor extraction system at site of former gasoline service station - Norton, MA
Project Manager geotechnical investigations and environmental site assessments - Union Station Revitalization Project - Worcester, MA
Conducted oversight of wastewater settling pit closure activities for a private manufacturing client - Brockton, MA
Fay, Spofford & Thorndike, Inc., Burlington, MA; 1981-1994; Principal Engineer Responsible for planning, design and construction of wastewater collection and treatment facilities. Project responsibilities also included infiltration/inflow studies, sewer system evaluation surveys, definitive subdivision reviews, report writing, bidding/award of contracts, and interfacing with clients, funding/regulatory agencies, contractors, subcontractors, and inspection teams.
Facilities Planning, Design & Construction of a $20 million wastewater treatment facility expansion from 2.0 to 4.2 MGD - Dartmouth, MA
Land application study, ocean outfall study - Dartmouth,
MA
Infiltration/Inflow Studies & Sewer System Evaluation Surveys - Dartmouth, MA; Billerica, MA
Sewer rehabilitation design & construction - Dartmouth, MA
Subdivision and sewer system extension reviews - Dartmouth, MA; Billerica, Ma; Smithfield, RI
Education Worcester Polytechnic Institute, M.S., 1994 Environmental Engineering Brown University, B.S., 1981 Civil Engineering
Accreditations Professional Engineer: Massachusetts and Rhode Island
Class III ISDS Designer - Rhode Island Certified Soil Evaluator - Massachusetts
Certified Title 5 Inspector - Massachusetts
Professional Affiliations American Society of Civil Engineers/Boston Society of Civil Engineers Water Environment Federation